What it does
The server analyses project schedules from Primavera P6 and Microsoft Project. Its stated checks include critical path method (CPM) calculations, float, the DCMA 14-point schedule assessment, logic checks and S-curves. Access is read-only, so the schedule files are analysed without being changed.
The publisher's description points to schedule analysis of P6 and MS Project files as the main use. The source material does not describe further workflows or setup steps.
Safety
Our team has not reviewed this resource. Only automated rules checked it; resources with high-risk signals are not published. These are signals, not a guarantee that installing it is safe. Try it in a sandbox project first.
- Runs code or changes an assistant's behaviour
Sources
- Official MCP Registry first seen 13 Nov 2026 · last seen 13 Nov 2026 · its page on the source
longpath
Read-only P6 / MS Project schedule analysis: CPM, float, DCMA 14-point, logic checks, S-curves.